Sand Production Caused by Water-Hammer Events: Implications for Shut-In Protocols and Design of Water-Injection Wells

TitleSand Production Caused by Water-Hammer Events: Implications for Shut-In Protocols and Design of Water-Injection Wells
Publication TypeJournal Article
Year of Publication2019
AuthorsWang, H., J. Hwang, and M. M. Sharma
JournalSPE Production & Operations
Volume34
Issue03
Start Page461
Pagination461-472
Date Published08/2019
ISSN1930-1855
Other NumbersSPE-189568-PA
KeywordsWater Injection / Injector Performance / Fractured Injectors
Abstract

A pressure pulse, known as a water hammer, can occur immediately after water-injection wells are shut-in for emergency or operational reasons. Large pressure pulses may cause wellbore-integrity problems such as sandface failure and sand production. We propose a new work flow to simulate water-hammer events, the resulting wellbore failure, and sand production in water injectors. On the basis of the results of this work flow, recommendations are made for wellbore design and shut-in protocols for water-injection wells.

For the first time, the results presented in this paper allow us to quantitatively understand the role of well shutdowns and subsequent water-hammer pressures on sand production. The failure of unconsolidated sands near the wellbore is affected by water-hammer events and their amplitude, period, and attenuation. If a water-hammer event occurs during the shut-in of water injectors, the extent of the sand failure becomes larger, and the failure zone continues to propagate along the stress-concentration direction. The simulation results clearly show the parameters that are important and suggest changes to well operations such as proper shut-in protocols that help to minimize the possibility of sand production. The results also suggest ways in which injectors can be designed to minimize the impact of water-hammer events.

DOI10.2118/189568-PA