Publications

2018

[1]
E. Karantinos, M. M. Sharma, J. A. Ayoub, M. Parlar, and R. A. Chanpura, “Choke-Management Strategies for Hydraulically Fractured Wells and Frac-Pack Completions in Vertical Wells”, SPE Production & Operations, 2018, doi: https://doi.org/10.2118/178973-PA.
Keywords: Proppant Placement, Choke-Management, Frac-Packing, Fracture modeling
[1]
A. Kumar, P. Seth, K. Shrivastava, and M. M. Sharma, “Optimizing Drawdown Strategies in Wells Producing from Complex Fracture Networks”, in SPE International Hydraulic Fracturing Technology Conference & Exhibition, Muscat, Oman, October 16-18, 2018: Society of Petroleum Engineers, 2018.
Keywords: Hydraulic Fracturing, Choke-Management, Fracture modeling, Fracture flowback

2017

[1]
E. Karantinos, M. M. Sharma, J. A. Ayoub, M. Parlar, and R. A. Chanpura, “A General Method for the Selection of an Optimum Choke-Management Strategy”, SPE Production & Operations, vol. 32, no. 02, pp. 137–147, 2017, doi: https://doi.org/10.2118/174196-PA.
Keywords: Choke-Management
[1]
E. Karantinos and M. M. Sharma, “Choke Management Under Wellbore, Completion and Reservoir Constraints”, in SPE Annual Technical Conference and Exhibition, San Antonio, Texas, October 9-11, 2017: Society of Petroleum Engineers, 2017.
Keywords: Choke-Management

2016

[1]
E. Karantinos, M. M. Sharma, J. A. Ayoub, M. Parlar, and R. A. Chanpura, “A General Method for the Selection of an Optimum Choke-Management Strategy”, SPE Production & Operations, 2016, doi: http://dx.doi.org/10.2118/174196-PA.
Keywords: Choke-Management
[1]
E. Karantinos, M. M. Sharma, J. A. Ayoub, and M. Parlar, “Choke Management Strategies for Hydraulically Fractured Wells and Frac-Pack Completions in Vertical Wells”, in SPE International Conference and Exhibition on Formation Damage Control, Lafayette, Louisiana, U.S.A., February 24-26, 2016: Society of Petroleum Engineers, 2016.
Keywords: Proppant Placement, Choke-Management, Frac-Packing

2015

[1]
E. Karantinos, M. M. Sharma, J. A. Ayoub, M. Parlar, and R. A. Chanpura, “A General Method for the Selection of an Optimum Choke Management Strategy”, in SPE European Formation Damage Conference and Exhibition, Budapest, Hungary, June 03-05, 2015: Society of Petroleum Engineers, 2015. doi: http://dx.doi.org/10.2118/174196-MS.
Keywords: Choke-Management

2014

[1]
R. J. Shor and M. M. Sharma, “Reducing Proppant Flowback From Fractures: Factors Affecting the Maximum Flowback Rate”, in 2014 Hydraulic Fracturing Technology Conference, The Woodlands, Texas, U.S.A., February 4-6, 2014: Society of Petroleum Engineers, 2014. doi: http://dx.doi.org/10.2118/168649-MS.
Keywords: Hydraulic Fracturing, Proppant Placement, Choke-Management